The tower crane is usually the largest single load on site and the most sensitive to power quality. Getting its generator wrong means stalled lifts, delayed pours and idle crews.
What decides the size?
- Total power of the hoist, slewing and trolley motors (kW)
- Drive type: frequency inverter (VFD) or direct-on-line
- Whether anything else shares the generator
- Summer heat — generator output drops in very high ambient temperatures
Rough starting points
| Crane total power | With inverter (VFD) drives | Direct-on-line (older) |
|---|---|---|
| ≈ 30 kW | 80–100 kVA | 100–150 kVA |
| ≈ 45 kW | 100–150 kVA | 150–200 kVA |
| ≈ 60 kW | 150–200 kVA | 200–250 kVA |
| ≈ 90 kW | 200–250 kVA | 250–400 kVA |
Planning starting points only. Always follow the crane manufacturer’s recommendation where it is higher.
Why older drives need more headroom
The hoist starts under load. With direct-on-line starting the current jumps several-fold for seconds; if the generator cannot carry it, voltage sags and the crane trips. Inverter drives start gently, but they produce harmonics that call for a somewhat larger alternator.
Tips from site
- A dedicated generator for the crane, kept apart from welders and compressors
- A feeder cable sized for the run length to limit voltage drop
- Maintenance by running hours — the crane will not wait
- A plan for breakdowns; our customer service runs around the clock
Common questions
Can a tower crane run on a generator alone?
Yes — it is common on Riyadh sites before the grid connection. What matters is enough capacity for starting current and a unit dedicated to the crane.
Why not share the crane generator with welders?
Welding and crane loads are large and intermittent; together they cause voltage dips that trip the crane’s protection mid-lift.
Where do I find the crane’s power?
From the crane’s data plate or manufacturer manual — many manuals state a minimum generator size in kVA.
General guidance; our technician confirms the size from your actual crane data.